|
Untitled Document
|
|
PT. Presisi Inti Persada,
Project Experience
- Metering Skid (Design Engineering, Fabrication and erection)
- Filling shed skid ( Design Engineering, Fabrication and erection )
- Automatic Tank Gauge ( Design Engineering )
- Master meter skid (Design Engineering and Fabrication)
- Supply Antenna and Cable
- UPD 2 Material Marshaling PCS
- UPD 2 Material Marshaling ESD, FGS, Modification and Console
- Assembly RTU Cabinet for 5 station
- Palangkaraya Airport Lighting Automation
- Monopole for radio antenna 20 meter
- Supply and erection air insulated medium voltage switch gear
- Recondition work for medium voltage switch gear
- Supply and erection air insulated medium voltage switch gear
- Supply and erection 13.8 KV switch gear
- Mini scada for Banda Aceh city
- Recalibrating medium voltage switch gear protection relay
|
| |
|